Vibration ProductsPrecaution
Major Precaution
Installation and retightening of screws.
The roughness of the surface of the equipment on which the vibrator is mounted should below 25S. Securely install the vibrator using flat and spring lock washers to prevent screws from loosening, because even one loose screw can cause an accident. All securing screws should be retightened after the vibrator has been installed, because the initial tightening force will be reduced when the mounting base surface is broken in.

Mounting position.
When installing the vibrator at an angle or vertically, position a vibrator and which has a snap ring in such a way that the snap ring side faces down, while a vibrator should be positioned in such a way that the ball bearing faces side, where two grease nipples are provided, faces downward.

Wiring
Install the cable being careful not to bend it at the cable connection opening to prevent it from being damaged by any vibration which may be transferred from the vibrator.
 
Terminal Box and Lead Cable
Daijeon Vibrator terminal boxes are filled with special component, which is not hard and adhesive to provide superior vibration, humidity, and dust resistance. The lead cable is an anti-vibration butyl rubber insulated chloroprene cab-tire cablet guarantees long life.
 
Lead Connection



To ensure safe operation, use the lead cable sizes shown in the table and connect them as shown in the diagram on the left.